Stormwater Pond Design & Preparation

Designing stormwater ponds means planning for harvesting, dredging, and maintenance that The Water Raptor can execute.

Design for harvestable geometry

Gentle side slopes, stable benches, and proper overflow locations ensure The Water Raptor can reach every inch of the pond. Plan sediment basins that are easy to dredge and stage haul-outs.

  • Include service pads and access routes for amphibious equipment.
  • Design flat benches that allow cutter heads and dredge arms to extend safely.
  • Direct inflows away from staging areas so we can keep turbidity low.
Stormwater pond planning

Stormwater readiness

We plan maintenance windows so the pond is clean before high-flow seasons.

Amphibious access

The Water Raptor glides from shore to water with no cranes, keeping crews on schedule.

Media Showcase

Stormwater readiness gallery

Images showing how we prep stormwater basins for long-term clarity.

Start designing for easy amphibious work

Tell us about your basin, stormwater load, and maintenance goals so we can build the deployment that keeps the pond functional.